Gallery

Courts That Play Better—And Look Elite

Paint, Resurface, Play

See the difference a pro finish makes—bold colors, crisp lines, and surfaces that invite play. Our gallery features before-and-after transformations, court conversions, and custom logos that bring personality to the game.

Most single-court repaints take 1–3 days depending on prep, weather, and custom graphics. Resurfacing adds time for repairs, leveling, and coating cure.

Absolutely. We’ll recommend color combos, provide mockups if needed, and ensure regulation-accurate striping for your sport.

Resurfacing addresses cracks, low spots, and texture; painting focuses on color and lines. Many projects include both for best results.

We use sport-appropriate, non-skid textures designed to balance traction with smooth play.

Light foot traffic is often okay after 24 hours; full play typically 48–72 hours depending on system and weather.